Refine
Document Type
- Public lecture (8)
- Article (6)
- Report (5)
- Book (1)
- Preprint (1)
Is part of the Bibliography
- no (21)
Keywords
- Bürgerbeteiligung (2)
- Bürgerbeteiligung, Leitlinien (2)
- Baden-Württemberg (1)
- Begleitende Evaluation (1)
- Beteiligung (1)
- Bürgerpartizipation (1)
- Evaluation (1)
- Infrastrukturplanung (1)
- Langzeitevaluation (1)
- Netzausbau (1)
Purpose – Governments and energy operators are often confronted with opposition to the construction of new high-voltage transmission lines. Besides other factors, a potential determinant of public opposition and acceptance that has gained increasing attention is the fairness of the planning and approval procedure as perceived by the citizens. The purpose of this study is to develop and validate a scale for measuring perceived procedural fairness (PPF).
Design/methodology/approach – The authors developed the ten-item “perceived procedural fairness scale (PPFS)” and assessed its quality by means of item response theory. By using a Rasch rating scale model, the authors tested whether the instrument met the requirements of this kind of measurement model. For conducting their research, the authors used data from two telephone surveys in Germany that were collected in areas that are affected by grid expansion.
Findings – The findings suggest that the scale can be considered a reliable and internal valid instrument for measuring citizens’ PPF.
Originality/value – At the moment, there is no psychometrically rigorously evaluated scale available for measuring PPF in the context of power grid expansion. Therefore, the study contributes to filling this gap and provides a valuable tool for researchers and practitioners concerned with further investigating citizens’ PPF and its relationships with other relevant constructs in the field.
Keywords - Policy, Procedural fairness, Procedural justice, Energy infrastructure, Power grid expansion, Item response theory, Rasch modelling
Policymakers and transmission system operators frequently face problems when planning and constructing new high-voltage transmission lines because of opposition among local residents. Protest varies due to attributes of the transmission lines (e.g., length and size), site-specific characteristics, and the extent of consternation among local residents. The most controversially discussed grid expansion project in Germany is the SuedLink, which has been causing severe protest among groups of local residents. One driver of public opposition is the existence of local citizens’ initiatives. These groups play an important role, for example by influencing the public debate, taking legal action, or mobilizing their members and other citizens into protest. In doing so, they can cause delays due to confrontational planning and approval procedures. In order to deal with these risks, decision-makers need to know about the actual effects of citizens’ initiatives on public protest. So far, however, empirical research on these effects has been sparse. This study contributes to filling this gap by considering one specific aspect of the influence of citizens’ initiatives. It isolates the causal effects of citizens’ initiative membership on members’ individual protest behavior in the context of the SuedLink. Controlling for various potential confounders, our results clearly indicate that the probability of performing protest behavior and the intensity of protest are substantially larger for members of citizens’ initiatives than for non-members.
Gute Bürgerbeteiligung
(2019)
Gemeinsam mit der IFOK GmbH hatte das InGFA für das Bundesministerium für Umwelt, Naturschutz und nukleare Sicherheit (BMU) wissenschaftlich fundierte und in der Praxis handhabbare Qualitätsstandards für Beteiligungsprozesse, die vom oder für das BMU durchgeführt werden, entwickelt.
Durch eine theoretische Fundierung und dem Einbezug des aktuellen Forschungsstandes vor dem Hintergrund der institutionellen und politischen Rahmenbedingungen des BMU wurde in Form eines neu erstellten Leitlinienkataloges ein für die Mitarbeiter/innen des Bundes-umweltministeriums in der Praxis handhabbarer Kriterienkatalog erstellt.
Die erstellten Leitlinien für gute Bürgerbeteiligung beruhen auf Hinweisen und Vorschlägen, welche in je einem BürgerInnen-Workshop sowie MitarbeiterInnen Workshop erarbeitet wurden. Weiter wurde im Entstehungsprozess der Leitlinien ein Fachgespräch zu "Bürgerbeteiligung bei Gesetzgebungsverfahren" mit MitarbeiterInnen des BMU durchgeführt. Im Anschluss an diese partizipativen Veranstaltungen fand eine Prüfung aller Hinweise, Rückmeldungen und Vorschläge statt. Die sich hieraus ergebenen Leitlinien-Empfehlungen stellten die Grundlage für den abschließend entwickelten und am 16.01.2019 auf einer Abschlussveranstaltung vorgestellten Leitlinienkatalog dar.
Die Leitlinien sind als Teil der Geschäftsordnung des BMU verbindlich anzuwenden und bieten den MitarbeiterInnen Orientierung für die Planung, Umsetzung und Bewertung von informellen Bürgerbeteiligungsverfahren.
Die Leitlinien können über die Homepage des BMU bezogen werden:
https://www.bmu.de/download/leitlinien-fuer-gute-buergerbeteiligung/
Der Vortag erörtert, wie durch systematische und formativ-begleitende Evaluation Beteili-gungsprojekte optimiert werden können. Konkret wird dies am Beispiel der Evaluation des Bürgerdialogs Stromnetz (BDS) durch das Deutsche Forschungsinstitut für öffentliche Ver-waltung (FÖV) dargestellt. Der BDS ist eine Initiative, die seit 2015 vom Bundesministerium für Wirtschaft und Energie (BMWi) gefördert und vom FÖV seit 2016 evaluiert wird und als Initiative sowohl die Betroffenen als auch die Bevölkerung insgesamt frühzeitig, umfassend und unabhängig über den Stromnetzausbau und die Beteiligungsmöglichkeiten für Bürgerin-nen und Bürger informiert. Die Evaluation konnte mit Hilfe von quantitativen und qualitati-ven Analysen Umsetzungsprobleme identifizieren und Lösungsvorschläge entwickeln, sodass bereits während der Umsetzungsphase steuernd eingegriffen werden konnte, um die Betei-ligungsangebote substanziell zu verbessern.